Through a competitive proposal process, Henry County Water Authority awarded the CMAR contract for the East Lake Booster Pump Station (BPS) Relocation project to the Lakeshore Engineering/JDS team.

The major project elements include preconstruction and construction to replace the existing East Lake BPS with a new BPS on the existing site, as well as installing approximately 5,000 linear feet of new water main outside the existing BPS property to improve system hydraulics.