City of Roberta WWTP Improvements
Owner: City of Roberta, GA
Contact Name: Trey Gavin – Carter & Sloope
Address: 6310 Peake Road, Macon, GA 31210
Phone Number: (678) 477-3923
Email address: tgavin@cartersloope.com
Year completed: 2011
Cost overruns: NONE
additional work was added to the project
Time delays: NONE
project was completed on schedule
Lakeshore Engineering was the prime contractor for modification to the solids handling system at the W.J. Hooper Water Production Plant. Work activities included the removal and dewatering of 2,000,000 gallons of alum sludge, the installation of a sludge removal system, concrete construction, piping modifications, pumping systems, electrical, and SCADA modifications.
WJ Hooper Solids Handling Improvements
Owner: Clayton County Water Authority
Contact Name: Guy Pihera – Water Production Manager
Address: 1693 Freeman Road, Jonesboro, GA 30236
Phone Number: (770) 603-5611
Email address: GPihera@ccwa.us
Year completed: 2012
Cost overruns: NONE
The project was value engineered to meet the budget
Time delays: NONE
The project was completed on schedule
Lakeshore Engineering was the prime contractor for modification to the solids handling system at the W.J. Hooper Water Production Plant. Work activities included the removal and dewatering of 2,000,000 gallons of alum sludge, the installation of a sludge removal system, concrete construction, piping modifications, pumping systems, electrical, and SCADA modifications.
CCWA Distribution System Pumping Improvements
Owner: Clayton County Water Authority
Contact Name: Cliff Beroset – Program Manager
Address: 1600 Battle Creek Road, Morrow, GA 30260
Phone Number: (678) 422-2828
Email address: CBeroset@ccwa.us
Year completed: 2012
Cost overruns: NONE
Time delays: NONE
The project was completed on schedule
Lakeshore Engineering was the prime contractor for the renovation of five pumping stations for the Clayton County Water Authority. The project involved the installation of new pumps at all the stations, piping modifications, extensive electrical work, SCADA upgrades, and concrete work.
Fort Gordon Gate 4 Booster Pump Station
Owner: Augusta Utilities Department
Contact Name: Stanley Aye – Construction Engineer
Address: 360 Bay Street, Suite 160, Augusta, GA 30901
Phone Number: (706) 826-4788
Email address: saye@augustaga.gov
Year completed: 2013
Cost overruns: NONE
additional work was added to the project which increased the final cost
Time delays: NONE
The project was completed on schedule
Lakeshore Engineering was the prime contractor for the construction of a new booster pump station to service Fort Gordon. The facility was constructed on a wooded lot adjacent to the base. Construction activities included clearing and grubbing, earthwork, concrete construction, masonry, ductile iron piping and valves, electrical, SCADA, and misc. building construction.
Skipper Road Booster Pump Station
Lakeshore Engineering was the prime contractor for the construction of a new booster pump station for the Macon Water Authority. Construction activities included building construction, pumps & variable frequency.