Gemini Booster Pump Station
Macon, Georgia
Macon Water Authority contracted Lakeshore Engineering to construct a new booster pump station on an accelerated schedule.
The project included constructing a new masonry building with an overhead crane, three 250 hp vertical pumps, 24” diameter ductile iron piping and valves, a backup generator, and extensive sitework.
Lakeshore performed the civil and mechanical portions of the project.
Client
Macon Water Authority
Status
Completed